To-Do List
- code update: to-do list (12/18)
- get ratio figures online (12/18)
- add description to ratio figs (12/18)
- notable progress on 'Results' (12/19)
- finish ModYY description (12/20)
02/22-03/05
Streamlines
plotting $v_\text{orb}/v_\text{wind} = 0.8$ runs
There are a few runs missing, but the trend is there.
Data Viewer
Under Construction
NOTE: The plots below are interactive.
Selected Model:
$M_2/M_1 = 0.8$ Plots
I've confirmed this should be $v_{wind}/v_{orb} = 0.8$ instead. These are currently running.
Grid Discontinuity
The discontinuity is back, though it does not appear to impact much this time. Below images are from re-run of the same model/resolution that was producing 'correct' results.
Closer Look at Velocity
Shown below is a $u=13\ \text{km s}^{-1}$ contour.