To-Do List
- code update: to-do list (12/18)
- get ratio figures online (12/18)
- add description to ratio figs (12/18)
- notable progress on 'Results' (12/19)
- finish ModYY description (12/20)
12/02-12/06
New Layout
Site has been moved to a new layout. Most elements are still under construction.
Data Visualization
Below is a proof of concept, more data coming soon.
It is interactive, move your mouse over it
Binary CSM & Runtime
I found two issues when originally running through the parameter space:
- The minimum radius used in the secondary gravity term was dependent on a specific location on the grid, so changing the inner/outer boundary radius would cause issues.
- For some parameters which create larger/smaller binary separation, the inner boundary would create an artifact.
I made it through a decent amount of the parameter space at 192x64x192, with a few runs at 384x128x384
- Low res:
- High res:
- Predictions:
Supernova & Runtime
Supernova is working, results coming soon
Radio
Radio has not been re-tested yet
General
Spherical Test
Overleaf Paper
Coming soon
day-by-day timeline
Coming soon